Estimasi Biaya Membangun Villa Mewah 2020 2021, desain villa tropis, desain villa tropis bali, desain villa tropis asri, desain villa tropis modern, desain villa tropis kontemporer, gambar desain villa tropis, gambar desain villa tropis modern, jasa desain villa tropis modern, jasa desain villa tropis minimalis, jasa desain villa tropis, jasa desain villa tropis minimalis sederhana,
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021 2024
Berikut Ulasan Video 3D Review Villa Mewah 2 Lantai :

jasa desain villa tropis asri, jasa desain villa tropis klasik, jasa desain villa tropis bali, jasa desain villa tropis 2 lantai, jasa desain villa tropis modern 1 lantai, jasa desain villa tropis sederhana, arsitektur desain villa tropis, villa tropis modern, villa tropis minimalis, villa tropis 2 lantai, villa tropis 2 lantai, villa tropis 1 lantai, villa tropis sederhana, villa tropis bali, villa tropis modern minimalis, villa tropis minimalis 2 lantai, villa tropis minimalis 1 lantai, villa tropis modern 2 lantai, contoh villa tropis modern,
Estimasi Biaya Bangun Villa Mewah 2 Lantai 2020 2021 2024
Pada Pembahasan kali ini kami Asia Arsitek akan membagikan Hitungan Biaya membangun Villa Mewah 2 Lantai.
Villa adalah tempat yang mungkin jauh dari keramaian dan hanya tempat singgah untuk sementara. Biasanya villa berada di pegunungan yang udaranya sejuk dan tergolong sangat nyaman.
Bagi anda yang sedang berencana untuk memiliki Villa sebagai private house anda. Tentu artikel kali ini akan sangat berguna dan sangat direkomendasikan untuk anda.
############### BACA SAMPAI TUNTAS ###############
Villa Mewah 2 Lantai
Jika anda ingin membangun villa, Anda harus memiliki konsep dan perencanaan yang matang. Karena biasanya villa berada di pegunungan / dataran tinggi, maka kemungkinan akan memakan biaya banyak dalam hal seperti :
- Mendatangkan Kontraktor
- pengiriman Material
- dan lain- lain
Untuk lebih mudahnya, kami akan memberikan contoh hitungan Real ( Nyata ) dari Projek Asia Arsitek yang telah masuk dalam proses pembangunan.
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021 2024
GAMBAR VILLA MEWAH 2 LANTAI ( GAMBAR PERENCANAAN )
Desain Eksterior.
Berikut Desain 3D Eksterior Villa Mewah 2 Lantai.
Gambar View Tampak Depan
Gambar Tampak Depan
Gambar View Kolam Ikan
Gambar View Tampak Belakang
Gambar View Tampak Atas
Gambar View Tampak Belakang
Desain Interior.
Berikut Desain 3D Interior Villa diatas.
Gambar View Ruang Keluarga
Gambar View Ruang Keluarga
Gambar View Ruang Tidur
Gambar View Ruang Tidur
Gambar View Ruang Makan
Gambar View Ruang Keluarga
Data Ukuran.
berikut data ukuran Villa diatas :
A). DATA UKURAN TANAH :
» Lebar Tanah : 14 m
» Panjang Tanah : 41 m
» Luas Tanah : 574 m²
B). DATA UKURAN BANGUNAN :
» Luas Basement : 56 m² ( meter persegi )
» Luas Lantai 1 : 94 m² ( meter persegi )
» Luas Lantai 2 : 93,4 m² ( meter persegi )
» Luas Bangunan : 243,4 m² ( meter persegi )
» fee desain arsitek : Rp. 24.340.000,-
FASILITAS :
LANTAI BASEMENT
- Teras
- Ruang Keluarga
- Ruang Tidur 1 + KM
- Ruang ART
- Kamar Mandi / WC
LANTAI 1
- Carport 1 Mobil
- Teras
- Ruang Tamu
- Ruang Tidur 3 + KM
- Pantry
- Ruang Makan
- Ruang Keluarga
- Ruang Tidur 2
- Kamar Mandi / WC
- Balkon
LANTAI 2
- Dak
- Balkon
- Ruang Tidur 5
- Ruang Tidur 6
- Kamar Mandi / WC
- Ruang Duduk
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
Berikut ini merupakan detail dari kebutuhan material rumah yang harus disiapkan ketika anda ingin memiliki villa mewah model seperti ini :
DAFTAR KEBUTUHAN MATERIAL & PEKERJAAN ALAT BANTU
A. PEKERJAAN PASANGAN, PONDASI DAN BETON BERTULANG
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| A | PEKERJAAN PASANGAN, PONDASI DAN | ||||
| BETON BERTULANG | |||||
| 1 | Batu Bata Merah | 3574 | bh | 600 | 2.144.400 |
| 2 | Bata Ringan Lokal T 10 cm | 63 | m3 | 600.000 | 37.570.260 |
| 3 | Roster (20×20) | 0 | bh | 12.200 | – |
| 4 | Split Beton 2/3 | 107 | m3 | 180.500 | 19.232.281 |
| 5 | Besi Beton Polos 8mm | 146 | btg | 43.117 | 6.288.746 |
| 6 | Besi Beton Polos 10mm | 39 | btg | 67.314 | 2.631.499 |
| 7 | Besi Beton Polos 12mm | 31 | btg | 97.333 | 3.034.580 |
| 8 | Besi Beton Ulir D 10 mm | 623 | btg | 67.732 | 42.225.994 |
| 9 | Besi Beton Ulir D 13 mm | 0 | btg | 113.706 | – |
| 10 | Besi Beton Ulir D 16 mm | 1176 | btg | 173.907 | 204.576.663 |
| 11 | Weirmesh M8 | 1555 | m2 | 48.501 | 75.416.718 |
| 12 | Plywood Tebal 9 mm | 406 | lbr | 104.000 | 42.187.960 |
| 13 | Dolken Ø-8-10/4m | 1909 | btg | 22.000 | 41.994.432 |
| 14 | Minyak Begisting | 174 | ltr | 15.000 | 2.607.772 |
| 15 | Bondex | 1555 | m2 | 100.050 | 155.573.308 |
| 16 | Formite/spacer | 6158 | bh | 5.000 | 30.791.200 |
| 17 | Kawat Beton | 317 | kg | 23.000 | 7.283.931 |
| 18 | Kawat Las | 526 | kg | 27.000 | 14.200.780 |
| 19 | Kawat Las Nikko | 0 | bh | 700 | – |
| 20 | Paku biasa 2″-5″ | 456 | kg | 17.500 | 7.973.211 |
| 21 | Paku Hak Panjang 15 cm | 0 | kg | 75.000 | – |
| 22 | Seng Gelombang | 133 | lbr | 25.000 | 3.325.200 |
| 23 | Meni Besi | 50 | kg | 44.500 | 2.219.571 |
| 24 | Pasir Beton | 0 | m3 | 250.000 | 120.000 |
| 25 | Pasir Beton Cilegon | 62 | m3 | 250.000 | 15.525.043 |
| 26 | Pasir Urug | 1 | m3 | 170.000 | 109.140 |
| 27 | Pasir Urug Cilegon | 17 | m3 | 170.000 | 2.956.916 |
| 28 | Pasir Pasang Putih Rangkas | 37 | m3 | 220.000 | 8.133.036 |
| 29 | Urugan Kerikil 3/5 | 3 | m3 | 193.000 | 607.950 |
| 30 | Tanah Urug Pilihan | 0 | m3 | 200.000 | – |
| 31 | Anti Rayap Tanah | 234 | m2 | 18.750 | 4.387.500 |
| 32 | Pas Ijuk | 16 | kg | 25.000 | 405.000 |
| 33 | HCL | 0 | ltr | 45.000 | – |
| 34 | Opening Untuk kusen allumunium dan Kayu/PVC & Garasi | 296 | m1 | 16.260 | 4.817.838 |
| 35 | Semen Tiga Roda 50 kg | 1322 | zak | 64.500 | 85.288.993 |
| 36 | Semen Warna | 295 | kg | 12.500 | 3.692.052 |
| 37 | Semen MU perekat bata ringan | 66 | zak | 84.000 | 5.522.828 |
| 38 | Beton K 250 Jaya Mix | 174 | m3 | 840.000 | 146.553.120 |
| 39 | Sewa Pompa Beton | 166 | m3 | 160.000 | 26.585.600 |
| 40 | Crawler crane lengkap | 0 | jam | 1.078.774 | – |
| 41 | Besi pelat | 0 | kg | 7.000 | – |
| 42 | Tiang Pancang 20X20 cm | 0 | m1 | 147.000 | – |
| TOTAL | 1.005.983.522 | ||||
B. PEKERJAAN KAYU UNTUK BEKISTING, RANGKA ATAP DAN PLAFOND
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| B | PEKERJAAN KAYU UNTUK BEKISTING, | ||||
| RANGKA ATAP DAN PLAFOND | |||||
| 1 | Kayu Balok 5/7/3 albasia | 9 | m3 | 2.000.000 | 18.621.120 |
| 2 | Kayu Papan albasia 2/20/3 | 1 | m3 | 2.083.333 | 1.616.417 |
| 3 | Balok Kayu 5/7 kelas III | 30 | m3 | 2.000.000 | 60.826.494 |
| 4 | Balok Kayu Kelas III | 17 | m3 | 2.000.000 | 33.991.892 |
| 5 | Steger Alat Bantu Kerja | 2 | ls | 57.500 | 115.000 |
| TOTAL | 115.170.923 |
C. PEKERJAAN KUSEN, PINTU DAN JENDELA
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| C | PEKERJAAN KUSEN, PINTU DAN JENDELA | ||||
| 1 | 1 Unit Pek. Pintu Lipat ( PL ) | 1 | unit | 9.867.859 | 9.867.859 |
| 2 | 1 Unit Pek. Pintu Jendela 1 ( PJ1 ) | 1 | unit | 8.465.666 | 8.465.666 |
| 3 | 1 Unit Pek. Pintu Jendela 2 ( PJ2 ) | 2 | unit | 7.660.697 | 15.321.394 |
| 4 | 1 Unit Pek. Pintu Jendela 3 ( PJ3 ) | 2 | unit | 6.830.459 | 13.660.918 |
| 5 | 1 Unit Pek. Pintu ( P1 ) | 6 | unit | 3.033.514 | 18.201.084 |
| 6 | 1 Unit Pek. Pintu ( P2 ) | 5 | unit | 2.613.033 | 13.065.165 |
| 7 | 1 Unit Pek. jendela ( J1 ) | 1 | unit | 6.108.299 | 6.108.299 |
| 8 | 1 Unit Pek. jendela ( J2 ) | 2 | unit | 7.190.907 | 14.381.814 |
| 9 | 1 Unit Pek. jendela ( J3 ) | 5 | unit | 5.554.403 | 27.772.015 |
| 10 | 1 Unit Pek. Jendela ( J4 ) | 1 | unit | 4.967.223 | 4.967.223 |
| 11 | 1 Unit Pek. Jendela ( J5 ) | 3 | unit | 5.297.928 | 15.893.784 |
| 12 | 1 Unit Pek. Jendela ( J6 ) | 1 | unit | 3.800.622 | 3.800.622 |
| 13 | 1 Unit Pek. Jendela ( J7 ) | 1 | unit | 6.836.139 | 6.836.139 |
| 14 | 1 Unit Pek. Jendela ( J8 ) | 2 | unit | 13.205.510 | 26.411.020 |
| 15 | 1 Unit Pek. Jendela ( J9 ) | 2 | unit | 1.271.154 | 2.542.308 |
| 16 | 1 Unit Pek. Jendela ( BV1 ) | 1 | unit | 808.247 | 808.247 |
| 17 | 1 Unit Pek. Jendela ( BV2 ) | 1 | unit | 797.389 | 797.389 |
| TOTAL | 188.900.946 |
D. PEKERJAAN KUNCI DAN ENGSEL
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| D | PEKERJAAN KUNCI DAN ENGSEL | ||||
| 1 | Kunci Tanam di Handle | 16 | bh | 180.000 | 2.880.000 |
| 2 | Kunci Tanam di Samping | 6 | bh | 93.000 | 558.000 |
| 3 | Kunci Grendel Jendela | 0 | bh | 55.000 | – |
| 4 | Kunci Allumunium Rambuncis | 20 | bh | 28.000 | 560.000 |
| 5 | Engsel Jendela Kupu-kupu | 0 | ps | 39.500 | – |
| 6 | Engsel Jendela Casement | 20 | ps | 46.500 | 930.000 |
| 7 | Engsel Pintu Kupu-kupu | 34 | ps | 133.000 | 4.522.000 |
| 8 | Kait Angin | 20 | ps | 20.000 | 400.000 |
| 9 | Door Closer | 0 | bh | 274.000 | – |
| 10 | Pegangan Pintu/Door Holder | 0 | bh | 120.000 | – |
| 11 | Asesoris Sliding | 0 | bh | 165.000 | – |
| 12 | Handle Pintu Single | 10 | ps | 210.000 | 2.100.000 |
| 13 | Handle Pintu Double | 5 | ps | 465.000 | 2.325.000 |
| TOTAL | 14.275.000 |
E. PEKERJAAN ATAP GENTENG
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| E | PEKERJAAN ATAP GENTENG | ||||
| 1 | Aluminum foil / Sisalation | 0 | m2 | 14.500 | – |
| 2 | Genteng Bitumen CTI | 0 | m2 | 195.000 | – |
| 3 | Nok Standard Allumunium | 0 | bh | 20.000 | – |
| 4 | Nok Ujung | 0 | bh | 25.000 | – |
| 5 | Nok 3 Way | 0 | bh | 25.000 | – |
| 6 | main truss C-75-75 | 0 | m1 | 14.667 | – |
| 7 | Roof Bottom/ reng R 33-0.45 | 0 | m1 | 10.000 | – |
| 8 | Trus Screw dia 6×20 mm | 0 | bh | 400 | – |
| 9 | Roof bottom screw | 0 | bh | 350 | – |
| 10 | Dynabol dia 12x120mm | 0 | bh | 15.000 | – |
| 11 | Atap Akrilik | 0 | m2 | 950.000 | – |
| 12 | Kaca Tempered 10 mm | 7 | m2 | 105.000 | 752.850 |
| TOTAL | 752.850 |
F. PEKERJAAN CAT / FINISHING
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| F | PEKERJAAN CAT / FINISHING | ||||
| 1 | Amplas | 80,996 | lbr | 10.000 | 809.960 |
| 2 | Cat Dasar | 98 | kg | 44.204 | 4.353.572 |
| 3 | Cat penutup 2x setara ICI / Dulux | 256 | kg | 94.000 | 24.070.516 |
| 4 | Cat tembok setara ICI / Dulux | 32 | kg | 88.125 | 2.855.109 |
| 5 | Plamir Tembok | 26 | kg | 44.000 | 1.140.424 |
| 6 | Rol Cat | 2 | bh | 34.500 | 55.887 |
| 7 | Steger Werk | 162 | ls | 1.000 | 161.992 |
| 8 | Pre Treatment / cleaning | 11 | m2 | 5.000 | 54.284 |
| 9 | Curbing Sudut | 4 | m1 | 35.000 | 151.996 |
| 10 | Sika Water Proofing 107 Seal + cairan | 11 | m2 | 31.333 | 357.191 |
| TOTAL | 34.010.932 |
G. PEKERJAAN PLAFOND
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| G | PEKERJAAN PLAFOND | ||||
| 1 | List Profil Gypsum (2.2m/Bt) | 15,645 | m1 | 10.000 | 156.450 |
| 2 | Gypsum board ( 120 x 240 x 9 ) mm | 48 | lbr | 65.000 | 3.151.559 |
| 3 | Gypsum WR ( 120 x 240 x 4 ) mm | 3 | lbr | 95.000 | 313.295 |
| 4 | GRC | 0 | m2 | 75.833 | – |
| 5 | Kalsiboard ( 120 x 240 x 4 ) mm | 24 | lbr | 32.500 | 786.222 |
| 6 | Compound | 26 | zak | 90.000 | 2.348.123 |
| 7 | Cotton Plaster | 15 | bh | 13.000 | 195.364 |
| 8 | Sekrup | 0 | kg | 50.000 | – |
| 9 | Sekrup gypsum | 22 | kg | 75.000 | 1.636.667 |
| 10 | Sekrup GRC | 8 | kg | 75.000 | 623.040 |
| 11 | Paku GRC | 0 | kg | 58.500 | – |
| 12 | Tepung Gypsum | 2 | kg | 4.500 | 10.058 |
| 13 | Kawat Pengait | 223 | is | 2.000 | 445.550 |
| 14 | Conwood ( 200x3050x11 ) mm | 0 | lbr | – | – |
| 15 | Hollow 2×4 | 38 | Btg | 45.000 | 1.731.524 |
| 16 | Hollow 4×4 | 88 | Btg | 69.000 | 6.069.142 |
| TOTAL | 17.466.992 |
H. PEKERJAAN LANTAI, DINDING KERAMIK DAN BATU ALAM
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| H | PEKERJAAN LANTAI, DINDING KERAMIK | ||||
| DAN BATU ALAM | |||||
| 1 | Keramik 60 x 60 cm setara Roman Granite | 0 | m2 | 500.000 | – |
| 2 | Keramik 30 x 60 cm setara Roman Granit | 68 | m2 | 130.000 | 8.891.298 |
| 3 | Granite tile 100 x 100 cm setara Indogress | 214 | m2 | 500.000 | 107.210.250 |
| 4 | Plint Granite tile 10 x 100 cm setara Indogress | 5 | m2 | 500.000 | 2.266.000 |
| 5 | Granite tile 60 x 60 cm setara Roman Granit | 1 | m2 | 170.000 | 178.500 |
| 6 | Keramik 40 x 40 cm setara KIA Monza | 4 | m2 | 82.000 | 301.350 |
| 7 | Keramik 40 x 40 cm setara KIA Monza | 0 | m2 | 61.000 | – |
| 8 | Keramik 30 x 30 cm setara Roman | 16 | m2 | 43.000 | 706.146 |
| 9 | WPC Deck | 22 | m2 | 775.000 | 17.034.500 |
| TOTAL | 136.588.044 |
I. PEKERJAAN BESI
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| I | PEKERJAAN BESI | ||||
| 1 | Besi Hollow 20 x 20 x 0,8 mm | 24,29109116 | btg | 44.620 | 1.083.868 |
| 2 | Besi Hollow 20 X 40 X 0,6 mm | 20 | btg | 45.000 | 913.048 |
| 3 | Besi Hollow 40 X 40 x 0,6 mm | 13 | btg | 69.000 | 913.815 |
| 4 | Besi Hollow 50 X 100 x 1,7 mm | 1 | m’ | 373.750 | 500.434 |
| 5 | bolt a325n | 66 | bh | 25.000 | 1.643.527 |
| 6 | Besi Baja I WF 200 x 100 x 5,7 x 8 mm – 12 M | 21 | m’ | 170.083 | 3.524.127 |
| 7 | Alat Bantu (bor)/genset | 56 | ls | 5.000 | 281.250 |
| 8 | Sewa alat las | 93 | jam | 56.250 | 5.212.586 |
| TOTAL | 14.072.655 |
J. PEKERJAAN INSTALASI LISTRIK DAN TITIK LAMPU
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| J | PEKERJAAN INSTALASI LISTRIK DAN | ||||
| TITIK LAMPU | |||||
| 1 | Lampu Down Light | 58 | bh | 58.000 | 3.364.000 |
| 2 | Lampu Pijar 12 Watt | 5 | bh | 91.000 | 455.000 |
| 3 | Lampu Pijar 18 Watt | 16 | bh | 145.000 | 2.320.000 |
| 4 | Lampu Dinding | 11 | bh | 174.000 | 1.914.000 |
| 5 | Lampu Gantung Minimalis | 0 | bh | 4.200.000 | – |
| 6 | Lampu Taman-SL26W | 7 | bh | 315.000 | 2.205.000 |
| 7 | MCB 6A | 13 | bh | 44.588 | 579.644 |
| 8 | Box Sekering 12 Group | 2 | bh | 40.000 | 80.000 |
| 9 | Arde Pentanahan | 1 | unit | 3.750.000 | 3.750.000 |
| 10 | Sparing Kabel SR PLN | 40 | m1 | 30.000 | 1.200.000 |
| 11 | Conduit pipa dia. 20 setara Clipsal | 543 | m | 3.200 | 1.738.464 |
| 12 | Kabel NYM 2,5×1,5 mm2 setara Eterna | 194 | m | 7.423 | 1.440.729 |
| 13 | Kabel NYM 3×2,5 mm2 setara Eterna | 336 | m | 10.584 | 3.554.531 |
| 14 | Kabel NYM 3×2,5 mm2 setara Supreme | 21 | m | 11.960 | 251.160 |
| 15 | Kabel Coaxial 5V-2C setara Federa | 35 | m | 7.750 | 268.538 |
| 16 | Exhaust Fan | 4 | bh | 255.000 | 1.020.000 |
| 17 | Splitter 6 port | 3 | bh | 60.000 | 180.000 |
| 18 | Saklar Ganda setara Broco | 9 | bh | 13.412 | 120.708 |
| 19 | Saklar tunggal setara Broco | 10 | bh | 9.870 | 98.700 |
| 20 | Saklar Triple setara Broco | 2 | bh | 17.493 | 34.986 |
| 21 | Saklar Seri Isi 4 | 4 | bh | 73.626 | 294.504 |
| 22 | Saklar Hotel 1 Gang | 4 | bh | 23.440 | 93.760 |
| 23 | Cover Penutup Stop Kontak (di area wastafel) | 5 | bh | 37.500 | 187.500 |
| 24 | STOP KONTAK BROCO G155SM55 | 0 | bh | 31.700 | – |
| 25 | Stop Kontak 13A setara Broco | 62 | bh | 17.367 | 1.076.754 |
| 26 | Stop Kontak Water Heater (AC) | 7 | bh | 49.623 | 347.361 |
| TOTAL | 26.575.338 |
K. PEKERJAAN SANITASI DAN INSTALASI SALURAN AIR
| No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
|---|---|---|---|---|---|
| K | PEKERJAAN SANITASI DAN INSTALASI | ||||
| SALURAN AIR | |||||
| 1 | Closet duduk TOTO CW 421 | 5 | bh | 2.590.000 | 12.950.000 |
| 2 | Closet jongkok TOTO CE 7 | 0 | bh | 384.000 | – |
| 3 | wastafel Setara TOTO LW 824 CJ (besar) | 4 | unit | 1.050.000 | 4.200.000 |
| 4 | wastafel setara TOTO LW 247 CJ | 1 | unit | 295.000 | 295.000 |
| 5 | Pipa pvc Ø 1/2″ | 125 | m1 | 5.850 | 728.676 |
| 6 | Pipa pvc Ø 1″ | 35 | m1 | 9.900 | 349.153 |
| 7 | Flexible Ducting Ø4″ setara Defa Flex | 0 | m1 | 24.500 | – |
| 8 | Pipa pvc Ø 3″ | 80 | m1 | 23.800 | 1.902.096 |
| 9 | Pipa pvc Ø 4″ | 226 | m1 | 81.025 | 18.316.187 |
| 10 | Pipa pvc Ø 3/4″ | 8 | m1 | 7.388 | 60.282 |
| 11 | Pipa PVC 4″ jenis AW | 16 | m1 | 157.596 | 2.553.055 |
| 12 | Pipa GIP 1 1/2″ | 15 | m1 | 194.140 | 2.912.100 |
| 13 | Pipa PVC 4″ berlubang jenis AW | 27 | m1 | 81.025 | 2.187.675 |
| 14 | Kran air TOTO T23B13V7NB | 6 | bh | 311.000 | 1.866.000 |
| 15 | Kran air TOTO SET + Shower TX432SD | 5 | bh | 5.000 | 25.000 |
| 16 | Kran air Setara TOTO TX603KM (kran leher angsa) | 1 | bh | 100.000 | 100.000 |
| 17 | Kran Ballvave Setara Ondo | 4 | bh | 23.000 | 92.000 |
| 18 | Floor drain TX1BN | 17 | bh | 55.000 | 935.000 |
| 19 | Roof drain San – Ei H01 4 inch | 8 | bh | 19.000 | 152.000 |
| 20 | Bak cuci stainless steel + asesoris lengkap (zink dapur) | 1 | bh | 1.350.000 | 1.350.000 |
| 21 | Bak fibreglass kapasitas 1 m3 setara Penguin | 0 | bh | 1.200.000 | – |
| 22 | Seal tape | 1 | bh | 5.000 | 2.625 |
| 23 | Water Heater Ariston 9L | 4 | bh | 2.190.000 | 8.760.000 |
| 24 | Solar Heat 300 L | 0 | bh | 31.000.000 | – |
| 25 | Shower Box sliding | 4 | bh | 2.100.000 | 8.400.000 |
| 26 | Jet Shower Setara TOTO THX20MCRB | 5 | bh | 240.000 | 1.200.000 |
| 27 | Grundfos JD Basic 7 jet pump 60m | 1 | bh | 8.448.000 | 8.448.000 |
| 28 | Sealant Closet & Wastafel | 2 | ls | 375.000 | 750.000 |
| 29 | Alat bantu lem, sok, keni dll | 2 | ls | 1.000.000 | 2.000.000 |
| TOTAL | 80.534.850 |
TOTAL HARGA KEBUTUHAN MATERIAL : Rp,- 1.634.332.052,-
Data diatas hanya menggambarkan kebutuhan material-material bangunan dasar yang harus disiapkan, diluar ongkos tenaga dan biaya lainnya.
Baca Juga :
» Jasa Desain Villa Mewah di Surabaya
» Jasa Desain Villa Mewah di Jakarta
» Jasa Desain Villa Mewah di Bogor Jawa Barat
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
Berikut adalah rekapitulasi lengkap biaya membangun rumah mewah diatas :
REKAPITULASI RENCANA ANGGARA BIAYA
PEMBANGUNAN VILLA MEWAH
| No. | URAIAN PEKERJAAN | JUMLAH HARGA (Rp) | JUMLAH HARGA TOTAL (Rp) |
|---|---|---|---|
| I | Pekerjaan Persiapan | 76.395.874 | 76.395.874 |
| II | Pekerjaan Galian Tanah & Urugan | 34.527.701 | 34.527.701 |
| III | Pekerjaan Struktur Beton Bertulang | ||
| A. Lantai 1 & Pondasi | 432.685.360 | ||
| B. Lantai 2 | 477.273.377 | ||
| C. Lantai Atap | 416.082.149 | 1.326.040.886 | |
| IV | Pekerjaan Dinding | ||
| A. Lantai 1 | 63.058.968 | ||
| B. Lantai 2 | 91.799.908 | ||
| C. Lantai Atap | 35.624.941 | 190.483.817 | |
| V | Pekerjaan Atap | 5.646.268 | 5.646.268 |
| VI | Pekerjaan Kusen, Pintu dan Jendela | ||
| A. Lantai 1 | 39.326.962 | ||
| B. Lantai 2 | 81.497.997 | ||
| C. Lantai Atap | 68.075.978 | 188.900.937 | |
| VII | Pekerjaan Engsel dan Kunci | 19.484.600 | 19.484.600 |
| VIII | Pekerjaan Instalasi Air & Sanitari | ||
| A. Lantai 1 | 60.787.978 | ||
| B. Lantai 2 | 83.626.621 | 144.414.598 | |
| IX | Pekerjaan Plafond | ||
| A. Lantai 1 | 1.256.329 | ||
| B. Lantai 2 | 19.127.187 | 20.383.517 | |
| X | Pekerjaan Keramik Lantai & Dinding | ||
| A. Pasangan Keramik Lantai 1 | 47.657.012 | ||
| B. Pasangan Keramik Lantai 2 | 132.462.153 | ||
| C. Pasangan Dinding Keramik Lantai 1 | 7.185.122 | ||
| D. Pasangan Dinding Keramik lantai 2 | 8.418.195 | ||
| E. Pasangan Keramik lantai Atap | 4.447.051 | 200.169.533 | |
| XI | Pekerjaan Instalasi Listrik | ||
| A. Lantai 1 | 20.368.338 | ||
| B. Lantai 2 | 49.358.296 | ||
| C. Instalasi Telepon + Instalasi TV | 4.550.673 | 74.277.307 | |
| XII | Pekerjaan Pengecatan | ||
| A. Lantai 1 | 14.127.412 | ||
| B. Lantai 2 | 25.730.576 | ||
| C. Lantai Atap | 8.128.330 | 47.986.318 | |
| XIII | Pekerjaan Lain – Lain | 102.045.010 | 102.045.010 |
| TOTAL = | 2.430.756.366 | 2.430.756.366 | |
| FEE KONTRAKTOR (10%) = | 243.075.637 | ||
| PPN / TAX = | by Owner | ||
| GRAND TOTAL = | 2.673.832.003 | ||
| ROUNDED = | 2.673.000.000 | 3.353.827 |
Hitungan Biaya Bangun Rumah Diatas Per meter persegi ( m² )
» Rp 2.673.000 ,- : 797 m² = Rp 3.353.827 per m²
Jadi, rencana pembangunan rumah tinggal diatas direncanakan dibangun dengan biaya Rp per m² ( meter persegi )
Baca Juga :
» Villa Desain Tropis Mewah
» Jasa Desain Villa Mewah Di Taman Dayu Pandaan
» Jasa Desain Villa Private House Mewah di Ciampea Bogor
VIDEO 3D VILLA LAINNYA – ASIA ARSITEK

Video 1

Video 2

Video 3
Bagi anda yang sedang berencana membangun rumah tinggal baik itu sederhana, minimalis, modern atau pun mewah. Kami Asia Arsitek merupakan penyedia jasa arsitek yang telah berpengalaman lebih dari 10 tahun.
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
INFO LEGKAP MENGENAI KAMI » HUBUNGI KAMI «

TAG : desain villa tropis, desain villa tropis bali, desain villa tropis asri, desain villa tropis modern, desain villa tropis kontemporer, gambar desain villa tropis, gambar desain villa tropis modern, jasa desain villa tropis modern, jasa desain villa tropis minimalis, jasa desain villa tropis, jasa desain villa tropis minimalis sederhana, jasa desain villa tropis asri, jasa desain villa tropis klasik, jasa desain villa tropis bali, jasa desain villa tropis 2 lantai, jasa desain villa tropis modern 1 lantai,
jasa desain villa tropis sederhana, arsitektur desain villa tropis, villa tropis modern, villa tropis minimalis, villa tropis 2 lantai, villa tropis 2 lantai, villa tropis 1 lantai, villa tropis sederhana, villa tropis bali, villa tropis modern minimalis, villa tropis minimalis 2 lantai, villa tropis minimalis 1 lantai, villa tropis modern 2 lantai, contoh villa tropis modern,
contoh villa tropis minimalis, contoh villa tropis 1 lantai, contoh villa tropis lantai 2, contoh villa tropis minimalis 1 lantai, biaya desain villa tropis modern, biaya desain villa tropis minimalis, biaya desain villa tropis minimalis sederhana, biaya desain villa tropis asri, biaya desain villa tropis klasik, biaya desain villa tropis bali, biaya desain villa tropis 2 lantai, biaya desain villa tropis modern 1 lantai, biaya desain villa tropis 1 lantai, biaya desain villa tropis sederhana, desain villa tropis type 36,